Continuous project memory

One system across
the whole asset lifecycle.

Each phase inherits the decisions, obligations, and evidence created before it.

Platerra eliminates the reset that normally happens when a deal becomes a project, design becomes construction, or construction becomes operations.

DADeal Analysis
ENTLEntitlements
DESIGNDesign & Engineering
PERMTPermitting
CONSTRUCTConstruction
LEASELease-Up
STABStabilization
01

Evaluate

Build the deal model, capture assumptions, compare scenarios, and connect diligence to the future project record.

02

Approve

Coordinate entitlement and permit milestones while preserving conditions that affect design, budget, and schedule.

03

Design

Align drawings, specifications, consultant work, submissions, and decisions around the delivery plan.

04

Build

Connect cost, schedule, field activity, quality, documentation, and change control in real time.

05

Operate

Carry asset records, tenant obligations, warranties, and final performance into lease-up and stabilization.

Build from the same reality.

Connect your next decision to everything that came before it.